Synchronization method for installation and adjustment of Baishitai Dizang large shear

1、 Firstly, use the correct method to place the main and auxiliary shears into the trench (note: if the control cabinet is on the left side of the boarding direction, the main shears should be placed in the left trench; if the control cabinet is on the right side, the main shears should be placed in the right trench),


百思泰地藏大剪安装与调整同步方法


2、 Connect the oil pipes according to the oil circuit diagram in the manual,


3、 Connect the limit wires 3 and 6 of the large shear to the circuit board respectively, and then connect the external power cord (note: 380V four core wire/220V three core wire, yellow green dual color wire are both ground wires),


4、 Add 20 liters of hydraulic oil to the control cabinet (note: use hydraulic oil 8 # 32 #. 46 #. 68 # according to local temperature),


5、 Power on and replenish oil. Before replenishing oil, first open and lift the valve of the large shear until the auxiliary shear rises 5cm, then close the valve. Then raise the large shear to the highest position to exhaust air to the oil cylinder. Loosen the air screw of the large shear at the upper end of the main cylinder three turns, wait for oil to come out, and tighten the screw to lower the lift to the lowest position. Then open and adjust the valve of the large shear while closing it, and raise the large shear to the highest position again to exhaust air to the oil cylinder,


6、 Fixing and adjusting the level: Lock the host in the same safety gear, place an adjustment pad on it, and the front and rear bottom plates of the large shear have horizontal screws. Place the iron plate under the horizontal screws and use them to adjust the level of the lift. Adjust the distance between the front, back, left, and right sides, use an impact drill (Ø 16 impact drill bit) to drill a hole to a depth of 150mm, and install 16 anchor bolts. (Note: Do not install expansion nails yet), adjust the horizontal position of the front two corner discs and the rear two sliding plate positions by observing the leveling ruler or transparent level tube and adjusting the adjustment screws on both sides of the bottom plate at the same time. The horizontal error of the two platforms should be ≤ 3mm, and the distance error between the two platforms from the lowest to the highest should be ≤ 10mm. Then install the center expansion nail of the anchor bolt and tighten the anchor bolt. The gap between the adjusted bottom plate and the ground must be filled with iron plate or cement mortar.


百思泰地藏大剪安装与调整同步方法


7、 Secondary lifting adjustment synchronization and air exhaust:


1. First, raise the large shear to a height of one meter and switch to the small shear gear. Open the valve of the small shear and press it up until it rises 5cm. Then close the valve and raise the small shear to the highest position to release air from the oil cylinder of the small shear;


2. Loosen the air screw of the small shear at the upper end of the main cylinder three times to remove oil, then tighten the screw and lower the small shear to the lowest position;


3. Then there is also an air screw at the bottom of the auxiliary cylinder of the small shear. Loosen the screw and open the valve of the small shear until the auxiliary cylinder of the small shear rises 3cm. Release the button, and the auxiliary cylinder of the small shear will automatically descend. When the small shear automatically descends to the lowest point, tighten the air screw of the auxiliary cylinder to synchronize.


百思泰地藏大剪安装与调整同步方法


8、 Synchronization method for adjusting the Dizang large shear:


1. First, determine whether the main shear starts first or the auxiliary shear starts first. If the main shear starts first, open the oil replenishment valve, press the up button three to five times, then close the valve and try to synchronize;


2. If it is the secondary shear, open the oil replenishment valve first, press and hold the lock button for three to five seconds, then close the valve and try to synchronize;


3. Attention: When adjusting synchronization, the lift should be lowered to the bottom or locked with safety for debugging. If there is a car, it should be debugged at the bottom. After getting on the car, remember not to open the valve and be sure to inform the user.


百思泰地藏大剪安装与调整同步方法

Explanation: The secondary lifting is also synchronized using the same method.

 

9、 Limit adjustment:

Check and adjust whether the upper limit switch of the main unit (sub unit) is normal.


10、 Trial load:

After everything is normal, the test load can be carried out and the oil and gas circuits should be checked for oil and gas leaks. After the trial load is normal, it can be put into normal use.